Major Project
John Deere Dewas Works
Dewas, India


Responsibility:

Preliminary design of entire factory and office; included in site selection, India based consultants & contractors selections; interior office fit and finish; plus on-site supervision of architectural elements and contractors

Project Cost: Overall $114m,
Building:                      $  24m

From:   Jan., 2011 to Dec., 2014

Main & Employee Entrance
Front Lobby at Main Entrance
 Board Room
John Deere Regional Warehouses
Renovation of existing, Relocation & New 


Lathrop, CA.
Front entrance before renovation.
Front entrance after renovation.
Portland, OR
Lobby before renovation
Lobby after renovation
 Office after renovation
Office before renovation
Responsibility:

Developed all preliminary designs for entire work required.  I was involved in the selection of local architectural firms, prepared bid documents & accepted bids.  I also acted as onsite John Deere representative with Building Officials and contractor.

Renovation Locations:  Portland Oregon, Regina Canada & Grimsby Canada.
Relocation Locations: Lathrop California & Atlanta Georgia.
New Locations:  Edmonton, Canada

Project Cost: Range from $3.5m to $10.5m

From:   2008 to 2009

John Deere Patiala Works
Patiala, India


Responsibility:

Similar to JDDW above but on a smaller scale.  There was an existing structure on site that we needed to include in the design.  The site was a challenge because of its shape.

Project Cost: Overall $9.5m,
Building:                      $4.5m

From;   Jan., 2011 to Dec., 2012


Main Entrance
 Site before construction
Factory Interior
John Deere Torreon Works
Torreon, Mexico


Responsibility:

Worked on four separate projects; Major Factory Expansion, Employee Security Entrance, Locker Rooms & Office Renovations.   We did preliminary designs and working drawings for the smaller projects and architectural Project Management for all projects.

Project Cost:  Range $4.5m to $250,000
From:              2000 to 2002
Geneseo City Hall & Police Station
Geneseo, Il


Responsibility:

Preliminary design and working drawings, cost estimate,
review of shop drawing, on-site construction supervision,
weekly job meeting and on-site supervision of
contractors.

Project Cost: Overall $8.5m

From:   2005 to 2006

Public Entrance
Interior Main Lobby
City Consul Chamber